Affiliation:
1. China Three Gorges University
2. Hubei Special Equipment Inspection and Research Institute
Abstract
How to implement the life-cycle management of water conservancy and hydro power project cost effectively, and how to distinguish the influence degree of different factors on project cost stage management. This is a key problem in project cost control. In this paper, based on the influence of each factor on the overall evaluation goal influence, FAHP is applied to set up Fuzzy Comprehensive Evaluation Model. Aiming at the variability characteristics of factors in each stage, the information entropy is used to determine the objective weight in the model, in combination with AHP the subjective weights to determine the weight.
Publisher
Trans Tech Publications, Ltd.
Reference6 articles.
1. H. Katagiri, M. Sakawa, K. Kato and I. Nishizaki, Interactive multi-objective fuzzy random programming: maximization of possibility and probability: European Journal of Operational Research, vol. 188(2008), pp.530-539.
2. Zhang Longyun, Zhang Qiangyong, Yang Shangyang. Application of Grey variable weight fuzzy optimization model in reinforcing soft foundation of water resources and power: Hydroelectric Energy(2013).
3. Hsiu-Fen Lin, Hsuan-Shih Lee, and Da Wei Wang, Evaluation of factors influencing knowledge sharing based on a fuzzy AHP approach: Journal of Information Science Online First(2008).
4. B. Liu, Fuzzy random chance-constrained programming: IEEE Transaction on Fuzzy Systems, vol. 9(2001), pp.713-720.
5. Hu Yonghong, He Sihui. Comprehensive evaluation method. Beijing: Science Press(2000).
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献