1. Y.Q. Rao, S.P. Liu, S.X. Li, and P.G. Li: Research on Agile Manufacturing Execution System in Shop Floor, China Mechanical Engineering Vol. 13 (2002), pp.654-656.
2. D.W. Wu, T.D. Lu, X.B. Liu and Y.S. Meng: Parallel Simulated Annealing Algorithm for Solving Job-Shop Scheduling Problem, Computer Integrated Manufacturing Systems Vol. 11 (2005), pp.847-850.
3. L.H. Zhao and F.Q. Deng: Improved Simulated Annealing Algorithm for Job Shop Schedule, Computer Engineering Vol. 32 No. 21 (2006), pp.38-40.
4. L.H. Zhao and F.Q. Deng: A Simulated Annealing Algorithm on Solving Job Shop Scheduling Problem, Manufacturing Automation Vol. 28 No. 3 (2006), pp.10-12, 23.
5. X. Liang, M. Huang and Z. Chang: New Genetic Annealing Hybrid Strategy for Job-Shop Scheduling Problem, Computer Integrated Manufacturing Systems Vol. 11 (2005), pp.851-854.