Abstract
Main cables of self-anchored suspension bridge are anchored at each end of main girder, thus producing a self-balancing system. In order to transfer the cable force to main girder safely and smoothly, the anchorage region is one of the most critical issues in design of a self-anchored suspension bridge. It is hard to fully understand the mechanical behavior only by spatial beam and column model, so a 3D shell finite element model is established to overcome the limitation of spatial beam and column model. The mechanical behavior of initial designed anchorage structure is then analyzed and a modified anchorage fabrication is proposed to improve the stress distribution. Analysis results show that: the modified anchorage system effectively reduces the stress level of anchorage structure and enhances the efficiency of anchorage structure.
Publisher
Trans Tech Publications, Ltd.
Reference4 articles.
1. WEI Hua, CHEN Miaotong, XU Dong: Construction Control of the Xixin Bridge-the Longest Span reinforced Concrete Girder Self-Anchored Suspension Bridge in China[in Chinese], in Structural Engineers, 2004; (3): 77-82.
2. John Sun, P.E.; Rafael Manzanarez, P.E.; and Marwan Nader, P. E: Design of Looping Cable Anchorage System for New San FranciscoCOakland Bay Bridge Main Suspension Span, in JOURNAL OF BRIDGE ENGINEERING.
3. Jianguo Nie; Muxuan Tao, S.M. ASCE; Jiansheng Fan: Research on Cable Anchorage Systems for Self-Anchored Suspension Bridges with Steel Box Girders, in JOURNAL OF BRIDGE ENGINEERING.
4. Li Xiaozhen, Cai Jing, Qiang Shizhong: STUDIES ON MODELS OF CABLE-GIRDER ANCHORAGE FOR LONG-SPAN CABLE-STAYED BRODGES WITH STEEL BOX GIRDER, in China Civil Engineering Journal.