Affiliation:
1. Wuhan Polytechnic University
Abstract
An optimal preventive maintenance scheduling model for deteriorating structures is presented. The random initial damage and the cumulative damages are quantitatively measured with the statistical distribution of a dominant fatigue crack size in the structure. The preventive maintenance for the structure in service is assumed to be possible only at a series of discrete times. By taking into account the costs of structure failure and preventive maintenance, a minimum cost rate criterion is established to determinate the optimal time for preventive maintenance. Finally, an illustrative example is given
Publisher
Trans Tech Publications, Ltd.