Analysis of the application of Risk Based Inspection method in the primary and secondary cooling pipe of TRIGA 2000 Bandung Reactor was conducted with the aim of obtaining a risk level value. To obtain the risk level value is carried out secondary cooling pipe thickness measurement using Ultrasonic Testing first. Furthermore, to obtain the risk level value, data such as pipe specifications, flowing fluid specifications, management system factors, measured pipe thickness data and previous inspection results, and pipe maintenance history will be used to calculate probability of failure (PoF) and Consequence of Failure (CoF) values. Probability of Failure and Consequence of Failure values are then plotted into a risk matrix to find out the level of risk that the component has. Risk level results can then be used to determine inspection methods and inspection intervals. The result of the risk level obtained from the calculation of the primary cooling pipe triga reactor 2000 is MEDIUM, lower than the risk level in the primary cooling pipe Kartini Reactor is MEDIUM HIGH. For the risk level of secondary cooling pipe Triga Reactor 2000 is MEDIUM is the same as the risk level of secondary cooling pipe Kartini Reactor. The recommended inspection methods for both reactors are the same using ultrasonic thickness measurement and visual examination inspection methods. Next inspection intervals for primary cooling pipes were 2068, 2092, 2104, 2110 and 2113 and for Kartini Reactor primary cooling pipes every 20 months. For Secondary cooling pipe Triga Reactor 2000 next inspection interval is 2067, 2090, 2101, 2106 and 2108 and for Kartini Reactor secondary cooling pipe every 10.11 years.

Publisher

Trans Tech Publications Ltd

Reference7 articles.

1. Development of TRIGA Fuel Fabrication by Powder Technique;Suwarno;Atom Indonesia,2015

2. I. W. Puradwi, Chairul S., Farokhi, Febrianto, Sriyono, and Slamet K, Identifikasi dan Analisis Penuaan Tangki TRIGA, 2000, https://inis.iaea.org/collection/NCLCollectionStore/ _Public/34/004/34004095.pdf

3. A.R. Antariksawan and I. Handoyo, Evaluasi Disain Sistem Pendingin Reaktor Triga Mark Ii Bandung Daya 2 MW, p.10, 2000, https://karya.brin.go.id/id/eprint/6841/.

4. API RP 581, 2016. Risk-Based Inspection. API American Petroleum Institute, 2016.

5. American Petroleum Institute, API RBI 580 - Risk-Based Inspection. American Petroleum Institute, 2009.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3