1. Determination of the duration of construction. DSTU B A.3.1-22:2013. National Standard of Ukraine. (2014). Kyiv: Ministry of Regional Development and Construction of Ukraine [in Ukrainian]. URL:
2. https://dbn.co.ua/load/normativy/dstu/dstu_b_a_3_1_22/5-1-0-1109.
3. Ivaneiko І. D., Mudryi I. B., Oleksiv Y. М. (2017). Method of forming effective sets jib cranes in conditions limiting the construction term. Modern technologies and methods of calculations in construction, 8, 87-94 [in Ukranian]. URL: https://eforum.lntu.edu.ua/index.php/construction/issue/view/13/12.
4. Ivaneiko I., Oleksiv Y. (2022). Optimization of deployment periods of non-rhythmic flow-lines by complex mechanized machines/ Theory and Building Practice/ Vol. 4, No. 2, 75-82. DOI: https://doi.org/10.23939/jtbp2022.02.075.
5. Hicks S. J., Lawson R. M., Rackham J. W., Fordham P. (2004). Comparative Structure Cost of Modern Commercial Buildings (Sec. Ed.) SCI P137, 85 p. URL: https://www.steelconstruction.info/images/d/df/SCI_P137.pdf.