Abstract
Planning construction sites involves determining the layout of temporary facilities on the site and significantly impacts the safety and efficiency of construction activities. However, such planning is a complex combinatorial problem that encompasses multiple objectives and becomes more challenging with an increasing number of objects and constraints on work execution conditions. To reduce the complexity of creating such solutions, the use of intelligent design systems is facilitated. The study analyzed existing information modeling technologies for finding optimal solutions based on adopted efficiency criteria and identified drawbacks in such systems. Through theoretical research, the conclusion was drawn that current information technologies for optimizing construction site planning address issues only in isolated aspects, such as minimizing the areas of administrative or storage facilities or reducing costs for unproductive resource movements.
Publisher
Lviv Polytechnic National University
Reference23 articles.
1. Anumba C., and Bishop G.(1997). Importance of safety considerationsin site layout and organization. Can. J. Civ. Eng., 24_2, 229-236. http://dx.doi.org/10.1139/cjce-24-2-229
2. Ushatskyi S., Sheiko Yu., Tryher H. Orhanizatsiia budivnytstva. (2007). http://pdf.lib.vntu.edu.ua/books/2016/Ushatskij_2007_521.pdf
3. Dorosh A. (2011). Orhanizatsiia budivelnoho vyrobnytstva. ISBN № 978-966-2007-16-9 (in Ukrainian)
4. Hryhorovskyi P. Nadtochii M. (2010). Vplyv umov ushchilnenosti zabudovy na vartist ta trudomistkist sporudzhennia zhytlovykh budynkiv. Novi tekhnolohii v budivnytstvi. 1. (19), 82-84. http://www.ntinbuilding.ndibv.org.ua/archive/2010/19/17.pdf (in Ukrainian).
5. Gaido A. (2017). Development of work execution design for construction of pile foundations in constrained city conditions. Bulletin of PNRPU. Construction and Architecture. Vol. 8. Pp. 74-85. DOI: 10.15593/2224-9826/2017.4.08 (in Ukrainian)