Switching 300 MW Power-Generating Units with Gas-and-Oil-Fired Boilers to Increased Load Mode

Author:

Mysak Stepan, ,Kuznetsova Marta,Martynyak-Andrushko Marta

Abstract

The goal of the research is to develop the guidelines for increasing the capacity of the operating 300 MW power-generating units by using the allowances assumed at the design computations and manufacture of the power-generating equipment, while preserving its reliability criteria and performance efficiency. The capacity of the operating power-generating units is increased in three stages. During the first stage, the technical state and operation conditions are established, measures aimed at increasing the capacity and increased load capabilities and reasons that may restrict them, as well as modernization and reconditioning measures are determined. The second stage includes developing technical solutions and reconstruction measures to increase the transfer capacity of the systems. At the third stage, the study and testing of the power-generating units’ equipment in the wide load range, including overload modes, are carried out with assessing and comparing the reliability criteria and efficiency indices. Technical measures intended to upgrade and modernize the equipment are low-cost. Most of them consist in ensuring the normal operating state of the existing main and auxiliary equipment of the power generating units.

Publisher

Lviv Polytechnic National University

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3