1. 1. Varetsky Y., Gajdzica M. (2015) Energizing arc furnace transformer in power grid involving harmonic filter installation. Przegląd Elektrotechniczny nr 4, s. 64 - 69. DOI: 10.15199/48.2015.04.17.(in Polish)
2. Misapplication of power capacitors in distribution systems with nonlinear loads - three case histories;Simpson Ronald;IEEE Transactions on Industry Applications vol 41 no 1 January/February,2005
3. 3. Witte J.F. et al: (1994) Damaging long-term overvoltages on industrial capacitor banks due to transformer energizing inrush current. IEEE Trans. on Industry Applications, vol.30, no.4, pp. 1107-1115.
4. 4. Varetsky Y., Gajdzica M. (2020) The procedure for selecting the ratings of capacitor banks and reactors of the filtering systems. Przegląd Elektrotechniczny, nr 96(3), pp. 77-81. DOI: 10.15199/48.2020.03.19.(in Polish)
5. 5. IEEE Std. P57.16/d7 - 2010. Draft Standard Requirements, Terminology, and Test Code for Dry Type Air Core Series Connected Reactors, New York, IEEE, 2010.