Author:
Yulian Triblas Adesta Erry,Agung Prabowo Herry
Abstract
Only a few companies in Indonesia have implemented Total Productive Maintenance (TPM) and Lean Manufacturing (LM) properly. They also implemented LM separately with TPM. To look beyond their implementation, a research through survey method will be conducted to identify the status of TPM and LM practices. The data recorded through the survey will be calculated and analysed using Structural Equation Modelling (SEM) with Smart-PLS as a programming tool. The expected results were to provide updated barriers and enablers factors in implementing TPM and LM, to produced reliable CFA (measurement) models for TPM, LM and MP and proposing reference model (structural model) of the relationship between TPM, LM, and MP for manufacturing industries in Indonesia.
Publisher
Science Publishing Corporation
Subject
Hardware and Architecture,General Engineering,General Chemical Engineering,Environmental Engineering,Computer Science (miscellaneous),Biotechnology
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献