Author:
Nageswara Rao M,Lokesh K,Harish V,Sai Bharath Ch,Venkatesh Y,Kumari. S Vara
Abstract
Flexible Manufacturing System (FMS) is a compli-cated system because of work environments, recu-peration frameworks, mechanized putting away, and material dealing with gadgets like robots and AGVs. In this paper, an endeavor is made by con-sidering both the machine and vehicle planning angles in FMS for minimization of the make trav-erse. Game plan is ensnared with the arrangement of incomplete assets to assignments in finished time. It is like Information-gathering process. It is related with the cost, operations, time and several objectives of the industry. In this work, RAPID ACCESS (RA) heuristic algorithm is adopted to solve the scheduling problems in FMS. Eighty, two problems and their existing solutions with different approaches are examined. The RA heuristic algo-rithm provides better solutions with less computa-tional time.
Publisher
Science Publishing Corporation
Subject
Hardware and Architecture,General Engineering,General Chemical Engineering,Environmental Engineering,Computer Science (miscellaneous),Biotechnology
Cited by
20 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献