1. Abba, W. (1991, January 17). The A-12 program management summary [Paper presentation]. National Security Industrial Association/Multispectral Scanner System (NSIA/MSS) Meeting, Los Angeles, CA, United States.
2. Beach, C. P. (1990). A-12 administrative inquiry: Report to the Secretary of the Navy. Department of the Navy.
3. Christensen, D. S. (1989, Fall). Management control systems theory and cost/schedule control systems criteria. National Estimator, 29–34.
4. Christensen, D. S., & Payne, K. (1992, April). Cost performance index stability—Fact or fiction? Journal of Parametrics, 10, 27–40. https://doi.org/10.1080/10157891.1992.10462509
5. Christle, G. L. (1981, Spring). Automation of program-project cost reports within DOD. National Estimator, 1, 22–27.