ANALISIS KORELASI PERSENTASE BIAYA CHANGE ORDER TERHADAP BOBOT PEKERJAAN PADA DUA PROYEK PERKERASAN JALAN KAKU

Author:

Filemon Ronaldo,Waty Mega

Abstract

Change order often occurs in the world of construction. Change order is work that is added to or deleted from the original scope of work of a contract and approved by the parties involved. The impact from the change order tend to hurts various parties. The scale of change order can be calculate using Change Order Ratio (COR), Change Order Ratio in Addiditon (CORA) dan Change Order Ratio in Substraction (CORS) formulas. This study examine 2 projects. The two projects are rigid road pavement projects. Project 1 cost increase and project 2 cost doesn’t increase or decrease. The output of pearson correlation between CORA and value of work of project 1 and project 2 shows a significant correlation and a strong of a linear relationship. The output of pearson correlation between CORS and value of work of project 1 shows no sign of correlation between the variabels but the output of pearson correlation between CORS and value of work of project 2 shows a significant correlation and a strong of a linear relationship.AbstrakChange order sangat sering terjadi pada dunia konstruksi. Change order adalah pekerjaan yang mengalami perubahan penambahan atau pengurangan pekerjaan dari kontrak awal yang disepakati oleh pihak yang bersangkutan. Dampak dari change order cenderung merugikan berbagai pihak. Besaran change order dapat dihitung dengan rumus Change Order Ratio (COR), Change Order Ratio in Addiditon (CORA) dan Change Order Ratio in Substraction (CORS). Terdapat 2 proyek perkerasan jalan kaku. Proyek 1 mengalami penambahan biaya dan proyek 2 tidak mengalami penambahan atau pengurangan biaya. Hasil korelasi pearson antara CORA dan bobot pekerjaan proyek 1 dan proyek 2 menyatakan korelasi yang signifkan dan hubungan yang kuat. Hasil korelasi pearson antara CORS dan bobot pekerjaan proyek 1 menyatakan tidak ada korelasi antara keduanya tetapi Hasil korelasi pearson antara CORA dan bobot pekerjaan proyek 2 menyatakan korelasi yang signifkan dan hubungan yang kuat

Publisher

Universitas Tarumanagara

Subject

General Medicine

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Analysis of importance level of change order for road construction projects (from the owner’s point of view);SIXTH INTERNATIONAL CONFERENCE OF MATHEMATICAL SCIENCES (ICMS 2022);2023

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3