1. Convin, W. H., Sandry-Garza, D. L, Biferno, M. A, & Boucek, G. P. (1989). Assessment of crew workload measurement me&n&, techniques, andprochres: 2. GvideIines for the use of workload assessment techniques in aircraft certificutim ( w i t Integration Directorate, WRDC Tech. Rep. No. 89-7006). Dayton, OH: Wright Research and Development Center.
2. Convin, W. H., Sandry-Garza, D. L, Biferw, M. A, Boucek, G. P., Logan, A. L., J o m n , J. E. & Metalis, S. A. (1989). Amesmnt of cmv workload measurement methods, techniques, andprocedures: I. P ~ A , methods, and -&s (Cockpit Integration Directorate, WRDC Tech. Rep. No. 89-7006). Dayton, OH: Wright Research and Development Center.
3. Lysaght, R. J., Hill, S. G., Dick, A. O., Plamondon, B. D., Linton, P. M., W~erwille, W. W., W a d , A. L., Bittner, A. C. &Wherry, R. J. (1989). Operator workload Cmprahensive review and evaluation of operator workload methohlogies (Tech. Rep. No. 851). Fort Rucker, AL: U.S. Army Research Institute.
4. McLucq J. L, Drinkwater, F. J. & Leaf, H. W. (1981). Report of thePresidcnt's TaskForce on Aircraft Crew Complement. Washington, DC: Presidential Task Force on Aircraft Crew Complement.
5. Metalis, S. A. (1991). Heart period as a useful index of pilot workload in commercial transport aircraft. Inter~lioMIJournal ofAviatim Psychobgy, 1,107-116.