Abstract
Construction projects in India are facing delays. It is essential to create a clear understanding among experts in the field and carry out an in-depth analysis of the causes of delays because the volume and capacity of the Indian construction sector have changed significantly over the past ten years. Construction delays have a considerable influence on residential projects budgets, schedules, and stakeholder satisfaction. Construction delays are a big issue in the residential construction industry since they increase costs, cause time delays, and disrupt quality. It is crucial to pinpoint the primary causes of these delays in order to reduce the effect they have on project performance. This research study attempts to give a thorough understanding of the factors that contribute to construction delays in residences. This study synthesises previous literature and research findings to investigate a number of factors, their interactions, and their influence on project delays. In order to properly manage and reduce construction delays in residential construction projects, the review underlines the relevance of recognising these aspects.
Publisher
Blue Eyes Intelligence Engineering and Sciences Engineering and Sciences Publication - BEIESP
Reference13 articles.
1. Arditi, D., Nayak, S., & Damci, A. (2017). Effect of organizational culture on delay in construction. International Journal of Project Management, 136-147. https://doi.org/10.1016/j.ijproman.2016.10.018
2. Asim, M., Deep, S., & Ahmad, S. A. (2016). Analysis of Delays in Indian Real Sector Construction Projects and their Impact on Overall Project Performance. International Conference in Construction, Real Estate, Infrastructure and Project Management (pp. 1-10). Pune: International Conference in Construction, Real Estate, Infrastructure and Project Management.
3. Assbeihat, J. M. (2016). FACTORS AFFECTING DELAYS ONPRIVATE CONSTRUCTION PROJECTS. International Journal of Civil Engineering and Technology (IJCIET), 22-23.
4. Deep, S., Asim, M., Kesarwani, N., & Kandpal, S. (2018). Identification of Delay Causing Actor in the Indian Real Estate Project: an AHP-Based Approach. Baltic Journal of Real Estate Economics and Construction Management, 116-130. https://doi.org/10.2478/bjreecm-2018-0009
5. Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 479-489. https://doi.org/10.1016/j.ijproman.2011.10.004