1. 1. Rysbekov, K., Toktarov, A., Kalybekov, T., Moldabayev, S., Yessezhulov, T. and Bakhmagambetova, G. (2020), "Mine planning subject to prepared ore reserves rationing", II International Conference Essays of Mining Science and Practice, Dnipro, Ukraine, vol. 168. https://doi.org/10.1051/e3sconf/202016800016
2. 2. Yakovlev, V.L., Berseniov, V.А., Kulniiaz, S.S. and Ligotskii, D.N. (2019), "Features of increasing the efficiency of a cyclical-and-continuous method while open-pit hard rock mining", Mining journal of Kazakhstan, no. 5, pp. 32-36.
3. 3. Kalybekov, T., Rysbekov, K., Sandibekov, М., Li Bi, Y., and Toktarov, A. (2020), "Substantiation of the intensified dump reclamation in the process of field development", Mining of Mineral Deposits,vol. 14(2), рр.59-65. https://doi.org/10.33271/mining14.02.059
4. 4. Bespoiasko, Ye.А., Yevtekhov, V.D. and Yevtekhov, Ye.V. (2013), "Mineral and raw-material base for mining and concentration enterprises of Kryvyi Rih basin", Mineralogical journal, T. 35, no. 4, pp. 66-72.
5. 5. Kravtsov, Ye.N. and Kravtsov, V.N. (2011), "Technogenic iron ore deposits - raw material base for obtaining high-quality concentrate", Quality of mineral raw material, vol. 55(12), pp. 337-339.