The Risk Adjustment of Required Rate of Return for Supply Chain Infrastructure Investments

Author:

MOON GISUNG,LeBLANC LOUIS A.

Abstract

Abstract The purpose of this article is to apply a risk-adjusted required rate of return to evaluate supply chain capital investments. As part of the design methodology, a computer simulation provides expected cash flows resulting from alternative supply chain investments. These cash flows are discounted at a risk-adjusted required rate of return. The analysis represents a process to measure the risk inherent in supply chain investments. The logistics and supply chain literature has not addressed this problem of the risk inherent in a specific supply chain project. A corporate-wide hurdle rate applied to usually conservative supply chain investments may result in less than adequate investments in supply chain infrastructure. Prior studies have determined risk-adjusted required rate of return for the entire firm, an enterprise's entire supply chain network, but not an individual project within the supply chain. This study calculates a required rate of return for a specific supply chain investment project using a discrete simulation model rather than the more common mathematical model. Individual supply chain investment projects may have less risk or possibly more risk than reflected by a corporate hurdle rate or a supply chain hurdle rate. Using a standard required rate of return could result in too little or too much investment in supply chain facilities. In this study, when the risk-adjusted rate was employed to discount expected cash flows, only two of eleven alternatives evaluated were acceptable investments. The best investment with the highest return was a 12 percent increase in ship loading rate combined with a 33 percent increase in rail unloading capacity. It provided a benefit-cost ratio of 1.25. The limited availability of publicly traded firms that invest in supply chain projects represents a constraint, limiting the accuracy of estimating the market risk factor. Nevertheless, the practical implication is that, when making supply chain infrastructure investment decisions, it is advisable to adjust risk factors in evaluating such capital investments. This approach is preferable to using a corporate-wide hurdle rate, typically too high for such conservative investments. A firm-wide hurdle rate might result in under investment in supply chain facilities.

Publisher

The Pennsylvania State University Press

Subject

Transportation

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3