1. Bezdek, J., 1980, A Convergence Theorem for the Fuzzy ISODATA Clustering Algorithms, IEEE Transactions on Pattern Analysis and Machine Intelligence, Vol 2, No 1, pp 1-8.
2. Chatteijee, S., 1992, Resourcing in Dynamic Manufacturing, Proceedings of ASME, PED-Vol.59, Concurrent Engineering, pp 361-374.
3. Drolet, J., Moodie, C.L., Montreuil, B., 1989, Scheduling Factories of the Future, Journal of Mechanical Working Technology, Vol.20, pp 183-194.
4. Drolet, J., Moodie, C. L., Montreuil, B., 1990, Virtual Manufacturing Layout Planning, International Industrial Engineering Conference Proceedings, IEE, San-Francisco, pp. 236-241.
5. Gindy, N. N. Z., Ratchev, T. M., Case, K., 1995, Component grouping for GT applications - a fuzzy clustering with validity measure, International Journal of Production Research, Vol. 33, No. 9, pp 2493-2509.