1. Bard J., Feinberg A., 'A Two-Phase Methodology for Technology Selection and System Design', IEEE Transactions on Engineering Management, Vol 36, No 1, Feb 1989, pp 28-36
2. Boucher T., MacStravic E., 'Multiattribute Evaluation within a Present Value Framework and its Relation to the AHP', The Engineering Economist, Vol 37, No 1, 1991, pp 1-32
3. Burstein M.C., Graham P., 'Markets, Manufacturing Strategy, and Technology Acquisition', in Manufacturing Strategy: The Research Agenda for the Next Decade - Proceedings of the Joint Industry University Conference on Manufacturing Strategy, Ann Arbor, MI, 1990, Ed.s J. Ettlie, M. Burstein, A. Figenbaum, Kluwer Academic Publishers, pp 109-116
4. Canada J.R., 'Non-Traditional method for Evaluating CIM Opportunities Assigns Weights to Intangibles', Industrial Engineering, Mar 1986, pp 66-71
5. Canada J.R., 'The Economics of CIM', in CIM Handbook, Ed by Teicholz, Orr, 1987, McGraw Hill, pp 4.415-4.444