1. Dalai, M.A.: Combined Effect of Job and AGV Dispatching Rules on a Flexible Manufacturing System, M.S. Thesis, V.P.I.S.U., Blacksburg, VA, 1991.
2. Egbelu, P.J.: A Design Methodology for Operational Control Elements for Automated Guided Vehicle Based Material Handling Systems, Ph.D Dissertation, V.P.I.S.U., Blacksburg, VA, 1984.
3. Egbelu, P.J., and Tanchoco, J.M.A.: Characterization of automated guided vehicle dispatching rules. International Journal of Production Research, Vol. 22, No. 3, pp. 359-374, 1984.
4. Kiran, A.S. and Smith, M.L.: Simulation studies in job shop scheduling -I & II, Computers & Industrial Engineering, Vol. 8, No. 2, pp. 87-104, 1984.
5. Pritsker, A. A.B.. Introduction to Simulation and SLAMII. John Wiley & Sons, 1984.