1. Alves, T. C. L. and Formoso, C. T. 2000. Guidelines for managing physical flows in construction sites. Proceedings of the 8th Annual Conference of the International Group for Lean Construction, Brighton, England.
2. Azambuja, M. M. B., Isatto, E. L., Marder, T. S., and Formoso, C. T. 2006. The importance of commitments management to the integration of make-to-order supply chains in construction industry. In: Sacks, R. and Bertelsen, S. (Org.). Proceedings of the 14th Annual Conference of the International Group for Lean Construction, Santiago, Chile, 609-624.
3. The concept of project complexity—a review
4. Ballard, G. 1997. Look-ahead planning: The missing link in production control. Berkeley, USA: Dept. of Civil and Environmental Engineering, Universityof California.Technical Report 97-3. 2000. The last planner system of production control. University of Birmingham. PhD Thesis.