1. Khanduri, A. C., Bedard, C., and Alkass, S. 1983. Life cycle costing of office buildings at the preliminary design stage. Proceedings of the 5th International Conference on Civil and Structural Engineering Computing 1-8.
2. Life-cycle cost optimization of steel structures
3. Fuzzy Discrete Multicriteria Cost Optimization of Steel Structures
4. Rafiq, M. I., Chryssanthopoulos, M., and Onoufriou, T. 2005. Comparison of bridge management strategies using life cycle cost analysis. Proceedings of the 5th International Conference on Bridge Management, Inspections, Maintenance, Assessment, and Repair 578-586.
5. Frangopol, D. M., Estes, A. C., Augusti, G., and Ciampoli, M. 1997. Optimal bridge management based on lifetime reliability and life cycle costs. Proceedings of the International Workshop on Optimal Performance of Civil Infrastructure Systems 98-115.