Organizational Framework of Construction Cost Management in the Context of the Implementation of Targeted Investment Programs (Through the Example of Moscow)

Author:

Prokhorova Yu. S.1,Karakozova I. V.1

Affiliation:

1. Moscow State University of Civil Engineering

Abstract

Currently, there is an excess of public investment allocated for the implementation of targeted investment programs related to construction in Moscow compared with the estimated limit, which requires a set of organizational tools for cost management (algorithms, models, methods, tools, etc.) aimed at improving the accuracy and reliability of the estimated construction cost.Aim. The presented study aims to develop a methodological approach to the organization of construction cost management in the context of public investment, with allowance for the enhanced interaction of executive authorities – both with one another and with other participants of the investment-construction process.Tasks. The authors analyze the activities of an executive authority in the development, coordination, and implementation of investment programs for the construction of facilities at the territorial level under modern conditions and develop a methodological approach to construction management with allowance for the enhanced interaction of executive authorities – both with one another and with other participants of the investment-construction process.Methods. The theoretical and methodological basis of this study includes fundamental provisions of management theory, economic theory, cost engineering, pricing in construction, mathematical modeling, project and risk management, practical experience and scientific works of Russian and foreign experts on the problem under consideration.Results. An organizational framework for construction cost management makes it possible to optimize the interaction of executive authorities – both with one another and with other participants of the investment-construction process – and to use methodological approaches to the formation of a reliable maximum limit of public investment for the purpose of implementing investment programs in construction in accordance with the set limit by establishing an Information Monitoring Center and a database to justify the estimated construction cost, creating and maintaining a database (information resource) containing all information about similar objects in accordance with economic efficiency criteria, monitoring implemented objects to update the database of construction projects.Conclusions. A methodological approach to the organization of construction cost management in the context of public investment is developed with allowance for the enhanced interaction of executive authorities - both with one another and with other participants of the investment-construction process.

Publisher

Saint-Petersburg University of Management Technologies and Economics - UMTE

Reference7 articles.

1. Decree of the Government of the Russian Federation of 05/12/2017 No. 563 (as amended on 12/31/2019) “On the procedure and the grounds for concluding contracts, the subject of which is the simultaneous execution of works on the design, construction and commissioning of capital construction facilities, and on amending some acts Government of the Russian Federation”. URL: http://www.consultant.ru/document/Cons_doc_LAW_216707/ (accessed on 05.06.2020). (In Russ.).

2. State Autonomous Institution “Department of State Expertise and Pricing of the Republic of Tatarstan for Construction and Architecture”. Official website. 2020. URL: http://gosekspertizart.ru/ (accessed on 05.06.2020). (In Russ.).

3. Karakozova I., Prochorova Y. Assessment of the efficiency of the decisions made during implementation of the investment project in construction. MATEC Web of Conferences. 2018;193(05002). DOI: 10.1051/matecconf/201819305002

4. Mazur I.I., Shapiro V.D., Ol’derogge N.G., Zabrodin A.Yu. Investment and construction engineering. Moscow: ELIMA, Ekonomika; 2009. 763 p. (In Russ.).

5. Belkina T.D. Diagnostics of urban development using a system of indicators. Problemy prognozirovaniya = Studies on Russian Economic Development. 2007;(2):77-89. (In Russ.).

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3