Affiliation:
1. Moscow State University of Civil Engineering
Abstract
Currently, there is an excess of public investment allocated for the implementation of targeted investment programs related to construction in Moscow compared with the estimated limit, which requires a set of organizational tools for cost management (algorithms, models, methods, tools, etc.) aimed at improving the accuracy and reliability of the estimated construction cost.Aim. The presented study aims to develop a methodological approach to the organization of construction cost management in the context of public investment, with allowance for the enhanced interaction of executive authorities – both with one another and with other participants of the investment-construction process.Tasks. The authors analyze the activities of an executive authority in the development, coordination, and implementation of investment programs for the construction of facilities at the territorial level under modern conditions and develop a methodological approach to construction management with allowance for the enhanced interaction of executive authorities – both with one another and with other participants of the investment-construction process.Methods. The theoretical and methodological basis of this study includes fundamental provisions of management theory, economic theory, cost engineering, pricing in construction, mathematical modeling, project and risk management, practical experience and scientific works of Russian and foreign experts on the problem under consideration.Results. An organizational framework for construction cost management makes it possible to optimize the interaction of executive authorities – both with one another and with other participants of the investment-construction process – and to use methodological approaches to the formation of a reliable maximum limit of public investment for the purpose of implementing investment programs in construction in accordance with the set limit by establishing an Information Monitoring Center and a database to justify the estimated construction cost, creating and maintaining a database (information resource) containing all information about similar objects in accordance with economic efficiency criteria, monitoring implemented objects to update the database of construction projects.Conclusions. A methodological approach to the organization of construction cost management in the context of public investment is developed with allowance for the enhanced interaction of executive authorities - both with one another and with other participants of the investment-construction process.
Publisher
Saint-Petersburg University of Management Technologies and Economics - UMTE
Reference7 articles.
1. Decree of the Government of the Russian Federation of 05/12/2017 No. 563 (as amended on 12/31/2019) “On the procedure and the grounds for concluding contracts, the subject of which is the simultaneous execution of works on the design, construction and commissioning of capital construction facilities, and on amending some acts Government of the Russian Federation”. URL: http://www.consultant.ru/document/Cons_doc_LAW_216707/ (accessed on 05.06.2020). (In Russ.).
2. State Autonomous Institution “Department of State Expertise and Pricing of the Republic of Tatarstan for Construction and Architecture”. Official website. 2020. URL: http://gosekspertizart.ru/ (accessed on 05.06.2020). (In Russ.).
3. Karakozova I., Prochorova Y. Assessment of the efficiency of the decisions made during implementation of the investment project in construction. MATEC Web of Conferences. 2018;193(05002). DOI: 10.1051/matecconf/201819305002
4. Mazur I.I., Shapiro V.D., Ol’derogge N.G., Zabrodin A.Yu. Investment and construction engineering. Moscow: ELIMA, Ekonomika; 2009. 763 p. (In Russ.).
5. Belkina T.D. Diagnostics of urban development using a system of indicators. Problemy prognozirovaniya = Studies on Russian Economic Development. 2007;(2):77-89. (In Russ.).
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献