BIM tool development enhancing collaborative scheduling for pre-construction

Author:

Tallgren Mikael Viklund,Roupé Mattias,Johansson Mikael,Bosch-Sijtsema Petra

Abstract

Construction projects often suffer from backlashes in relation to poor plans and schedules. Especially pre-construction planning has been challenging due to a high complexity, an extensive amount of information, and a lack of site managers time to make the schedule. To solve these issues for pre-construction planning; new planning processes, methods and tools have been developed over the last decade. However, due to a disregard of the current planning processes these tools have been difficult to adopt in practice. In addition, these developed tools and methods are seldom developed from the user’s point of view. A promising development is the introduction of integrated planning as a concept in construction companies. It involves the use of BIM models in concert with a planning approach where the subcontractors engage in the planning. However, currently available tools are more geared towards experienced users such as expert planners and does not allow for a fully collaborative and integrated planning approach. While many current tools would tick many of the requirements identified, they still fail to address the base requirements from the collaborative work environment literature. This paper contributes with a user-centric design and development of a collaborative planning application showing the integration of the existing collaborative planning process. By adopting a socio-technical approach, the paper focuses on combining technology and processes supporting the users and their way of working in order to enable adoption of the solution. A design science research approach has been used to gather requirements and develop and evaluate the Visual Project Planner (VPP) application. The VPP application applies a collaborative, visual approach supporting interdisciplinary knowledge sharing between all parties involved where the subcontractors actively can contribute to schedule. The VPP application has potential to reduce time for pre-construction planning regardless of the planning approach used.

Publisher

International Council for Research and Innovation in Building and Construction

Subject

Computer Science Applications,Building and Construction,Civil and Structural Engineering

Reference60 articles.

1. Alnasseri, H. A. (2015) ‘Understanding Applications of Project Planning and Scheduling in Construction Projects by due permission of the Faculty of Technology at Lund University , Sweden is to be defended in’, (September).

2. AlNasseri, H. and Aulin, R. (2015) ‘Assessing Understanding of Planning and Scheduling Theory and Practice on Construction Projects’, Engineering Management Journal, 27(2), pp. 58–72.

3. Baldwin, A. and Bordoli, D. (2014) Handbook for construction planning and scheduling. John Wiley & Sons.

4. Ballard, G. (2000) The last planner system of production control. The University of Birmingham.

5. Ballard, G. and Howell, G. (2003) ‘Lean project management’, Building Research & Information, 31(2), pp. 119–133. doi: https://doi.org/10.1080/09613210301997.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3