A socio-technical intervention in BIM projects – an experimental study in global virtual teams

Author:

Anderson Anne,Ramalingam Shobha

Abstract

‘Global Projects’ and ‘Global Virtual Teams’ are revolutionizing the construction industry. An increasing number of multi-national engineering firms are adopting this business model due to the possible advantages of cost and time optimization. However, literature identifies several challenges that the project teams endure in temporarily organizing while transitioning through time and space, some of which include cross-cultural differences in teams and limited richness of the communication media. Perceiving virtual project execution as a multi-variable construct, organizational theorists and sociologists adopt a socio-technical approach to understand the dynamics of action embedded in the process and recommend implementation of pre-process, during process or post process intervention strategies to enable performance. In this paper, we address this research concern through an experimental study conducted across two global universities, National Institute of Construction Management and Research, Pune, India and Washington State University, USA. Around 24 students from each university in ten teams collaborated virtually for a period of 2.5 weeks to develop a 3-dimensional Revit model and a 4-dimensional BIM model in Autodesk Revit and Navisworks, respectively, for a multi-storey residential building. The study aimed to investigate the role of project teams in organizing and coordinating projects tasks and taking a socio-technical approach, explored the role of a BIM Execution Plan as a pre-process intervention strategy. Data collected through qualitative survey post the experiment was qualitatively analyzed using ethnographic coding techniques. Findings showed that the project and team challenges primarily stemmed from coordination issues and institutional differences. Members significantly mitigated the issues through a proactive approach and a priori planning. The BIM Execution Plan allowed members to instantly get involved with the tasks and plan the process apart from being able to foresee the complexity. Teams emphasized the importance of implementing a detailed BIM Execution Plan during the planning phase for a collaborative and successful project outcome and further observed that pre-process intervention strategy such as a BIM plan was the needed impetus for members to collaborate and coordinate project tasks.

Publisher

International Council for Research and Innovation in Building and Construction

Subject

Computer Science Applications,Building and Construction,Civil and Structural Engineering

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Face to Face or Online: Towards a New Relational Governance of Building Design Projects;Architectural Design and Management in the Digital Age;2024-08-30

2. Teaching Building Information Modeling Courses in Construction Programs;Computing in Civil Engineering 2023;2024-01-25

3. Virtual Teams in the University: A Critical Literature Review and A Research Agenda;Marketing and Management of Innovations;2024

4. A Systematic Review of Engineering Students in Intercultural Teamwork: Characteristics, Challenges, and Coping Strategies;Education Sciences;2023-05-24

5. Global software engineering in a global classroom;Proceedings of the ACM/IEEE 44th International Conference on Software Engineering: Software Engineering Education and Training;2022-05-21

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3