Author:
Khosakitchalert Chavanont,Yabuki Nobuyoshi,Fukuda Tomohiro
Abstract
Quantity takeoff based on building information modeling (BIM) is more reliable, accurate, and rapid than the traditional quantity takeoff approach. However, the quality of BIM models affects the quality of BIM-based quantity takeoff. Our research focuses on drywalls, which consist of wall framings and wall panels. If BIM models from the design phases do not contain wall framing models, contractors or sub-contractors cannot perform quantity takeoff for purchasing materials. Developing wall framing models under a tight schedule in the construction phase is time-consuming, cost-intensive, and error-prone. The increased geometries in a BIM model also slow down the software performance. Therefore, in this research, an automatic method is proposed for calculating quantities of wall framings from drywalls in a BIM model. Building elements that overlap with the drywalls are subtracted from the drywall surfaces before calculation. The quantities of wall framings are then embedded into the properties of drywall in the BIM model and hence they can be extracted directly from the BIM model. A prototype system is developed and the proposed method is validated in an actual construction project. The results of the case study showed that the prototype system took 282 s to deliver accurate quantities of wall framings with deviations of 0.11 to 0.30% when compared to a baseline, and the file size of the BIM model after applying the proposed method was increased very slightly from 47.0 MB to 47.1 MB. This research contributes to developing an approach for quantity takeoff of wall framings that are not present in a BIM model. Accurate quantities of wall framings can be obtained while the time and cost of developing wall framings for quantity takeoff can be saved. The proposed method does not increase the geometries in the BIM model; therefore, the file size of the model does not increase greatly, which stabilizes the software performance.
Publisher
International Council for Research and Innovation in Building and Construction
Subject
Computer Science Applications,Building and Construction,Civil and Structural Engineering
Reference46 articles.
1. Abushwereb M., Liu H. and Al-Hussein M. (2019). A knowledge-based approach towards automated manufacturing-centric BIM: wood frame design and modelling for light-frame buildings. In Modular and Offsite Construction (MOC) Summit. Alberta, Canada, 100–107.
2. AGACAD (2020). BIM Software & Autodesk Revit Apps T4R (Tools for Revit) - AGACAD TOOLS4BIM. Available at: http://www.aga-cad.com/ [Accessed 23 September 2019].
3. Andersson L., Farrell K., Moshkovich O. and Cranbourne C. (2016). Implementing virtual design and construction using BIM: current and future practices. Routledge.
4. Autodesk (2016). Dynamo BIM. Available at: http://dynamobim.org/ [Accessed 10 January 2018].
5. Bečvarovská R. and Matějka P. (2014). Comparative analysis of creating traditional quantity takeoff method and using a BIM tool. In Construction Maeconomics Conference.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献