FINANCE-BASED PROJECT SCHEDULING USING MULTIPLE SOURCES OF FINANCE: A MULTI-OBJECTIVE APPROACH

Author:

Hoseini Androod Sama,Bamdad ShahroozORCID

Abstract

A successful project is subjected to timing and cash flow management. Different objectives are considered in project scheduling, and financial goals are the most challenging ones. Lack of liquidity is one of the problems that cause a delay. To avoid these delays, project financing is essential. In most projects, a credit line (CL) is considered a source of cash. The contractors should remain below the credit limit imposed by the lender bank. This limit may cause an extension in duration because some activities cost too much, and the available cash cannot satisfy the expenses. In this paper, a new finance-based scheduling model is proposed. In addition to CL, other resources like long-term and short-term loans are considered. The objective of this study is to minimize the project duration and financing costs. The results show that financing costs and project duration can be decreased by using different financing alternatives.

Publisher

EdiUNS - Editorial de la Universidad Nacional del Sur

Subject

Mechanical Engineering,General Chemical Engineering,General Chemistry

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3