On the issue of effectiveness of the oil production electrical equipment repairs management with a strategy for technical condition

Author:

Levin V. M.1ORCID,Guzhov N. P.1,Boyarova D. A.1

Affiliation:

1. Novosibirsk State Technical University

Abstract

PURPOSE. To consider aspects of solving the complex problem of reasonable choice and assignment of the repair management strategy for the equipment of power supply systems of oil production consumers according to the actual technical condition. To form a methodology for assessing the comparative effectiveness of repair management strategies: «By frequency, running hours» and «By technical condition». To verify the performance of the integrated methodology. Justify and demonstrate the effectiveness of the repair management strategy: «By technical condition» of the equipment on the real example of the typical scheme of the electrical supply system of oil fields.METHODS. In solving the problems set: the method of block diagrams for calculating the structural reliability of electric distribution network, including the probabilities of power supply failure in the circuit of each technological consumer, taking into account the possibility of redundancy and imposing an emergency restoration of the main element on the planned repair of the reserve, the method of hierarchy analysis for integral assessment of the actual technical condition of electrical equipment 6 (10) kV, method of calculating the mathematical expectation of damage from technological losses of oil production to assess the severity of the consequences of disruption of electricity supply to consumers of oil production, the method of expert decisions to adjust the regulatory periodicity and frequency of scheduled repairs of equipment, depending on the actual value of technical condition index.RESULTS. The relevance of the research direction is substantiated. Computational methodology of comprehensive assessment of comparative efficiency of equipment repair management strategies in oilfield power supply system «By frequency, running hours» and «By technical condition» to justify the priority of one of them has been formed. On a concrete computational example the preference of strategy choice «By technical condition» is proved as applied to the equipment of 6(10) kV power supply systems of oil fields.CONCLUSION. The developed methodology and its validation on the example of a real power supply system allows to substantiate and illustrate the effectiveness of the strategy «By technical condition» in comparison with the strategy: «By frequency, running hours» in relation to the management of repairs of oil production facilities.

Publisher

Kazan State Power Engineering University

Subject

Pharmacology (medical),Complementary and alternative medicine,Pharmaceutical Science

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3