Comparison Between the BOQ of Conventional and BIM Method on BPJS Building in Central Jakarta

Author:

Akbar Mutia Hanuun Ufaira

Abstract

In the construction planning process, the calculation of the quantity of each project work was packaged in a Bill of Quantity (BoQ) to complete the project and greatly affected the continuity of the entire construction construction process. With advances in technology in the world of construction, it could simplify planning in built a building and could increased the accuracy of calculations without using assumptions that could increased the volume of work. One of the results of current technological advances was the creation of the Building Information Modeling (BIM) method, a method that was able to simulate all information in a development project into a 3-dimensional model. Currently the use of the BIM method in Indonesia was still limited so that in this research, the aim was to determine the effectiveness of the use of BIM on the accuracy calculation of the volume of the BoQ and to know the percentage comparison. The building project that was used as a comparison was a building with the middle rise building category, namely the Central Jakarta BPJS Building. Based on the research conducted, it was found that the difference between conventional and BIM results on pilecap components was 5%, column 6%, beam 35%, floor slabs 2%, stairs 22%, ceiling 2.26% floor coverings 14% lower than conventional calculations but for the wall component the BIM calculation is 0.78% greater than the conventional calculation. So that the total percentage ratio is 10%, thus this proves that the use of the BIM method in calculating quantity was effective in terms of calculation accuracy.

Publisher

Politeknik Negeri Bali

Subject

General Medicine

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Comparing Task Performance of BIM and CAD in Completing Construction Project Activities: A Lab Experiment Approach;Journal of Architectural Engineering;2024-12

2. Waste material analysis for BoQ control on structural work using Building Information Modeling (BIM);INTERNATIONAL CONFERENCE ON MECHANICAL MATERIALS AND RENEWABLE ENERGY (ICMMRE 2022);2023

3. Cost calculation comparison of wall finishing work on project X between conventional method and BIM method;INTERNATIONAL CONFERENCE ON MECHANICAL MATERIALS AND RENEWABLE ENERGY (ICMMRE 2022);2023

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3