تأثير عوامل التحفيز على أداء المشروع في مشاريع البناء في اليمن

Author:

Alaghbari Wael,Sultan Busel,Al-Yousfi Sakhr Q.

Abstract

Human factors seem to be not highly respected in construction projects in Yemen. Construction project managers and contractors focus on the technical skills of project key individuals. However, less attention is paid to their capabilities of managing project people. This study is to identify motivation factors that most significantly influence construction project performance. The data were collected through a questionnaire from 91 construction project team members representing 18 project teams executed by 18 first-class construction companies in Yemen. The relative importance index (RII) was determined the most significant motivation factors. In addition, multiple regression analysis used to find the influence of motivation factors. The top motivational factors ranked by companies’ managements were; (1) relationship with colleagues, (2) advancement, (3) work itself, and (4) achievement. Among the 10 motivational factors investigated, only three motivational factors- achievement, appreciation and relationship with colleagues significantly influence the time performance of construction projects.The findings imply that the time performance of construction projects will be improved if motivation factors are properly applied in construction project environment. The study recommended proper handling of motivation factors which are a part of human factors for achieving improved project time performance.

Publisher

Queen Arwa University

Reference40 articles.

1. ⬧ Aiyetan, A. O., & Olotuah, A. O. (2006). Impact of motivation on workers’ productivity in the Nigerian construction industry. In D. Boyd (Ed.), Procs 22nd Annual ARCOM Conference, 4-6 September 2006 ) , Birmingham, UK, Association of Researchers in Construction M , (pp. 239-248).

2. ⬧ Alaghbari, W., Al-Sakkaf, A., & Sultan, B., (2018). Factors affecting construction labour productivity in Yemen, International Journal of Construction Management, 19(1): 79-91. doi: 10.1080/15623599.2017.1382091.

3. ⬧ Alaghbari, W., Saadan, R.S., Alaswadi, W. and Sultan, B. (2018). “Delay Factors Impacting Construction Projects in Sana’a - Yemen”, PM World Journal, (Dec. 2018).

4. ⬧ https://pmworldlibrary.net/wp-content/uploads/2018/12/pmwj77-Dec2018-delay-factors-impacting-construction-projects-in-yemen4.pdf

5. ⬧ Alaghbari, W., & Sultan, B. (2015). The most significant factors influencing productivity during execution of construction projects in Yemen. Engineering Sciences Journal, 1(4), 41-57.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3