1. [1] Japan Society of Production Management. Toyota Production System. Nikkan Kogyo Shimbun, 1996.
2. [2] Guixiang JIN, Akihiro NAKATSUKA, Hiroaki MAT SUKAWA, The SURUGA Gateway: An Advanced CPS Equipping Smart Factory Innovation and Supply Chain Management, vol.13, no.2, pp.21-32.
3. [3] Jae-kei Yanagi, Yoshiaki Shimizu. Improving overall efficiency in the production system through JIT production expansion. Transactions of the Japan Management Association, Vol. 54,No. 3, pp. 194-201 (2003).
4. [4] Masao Yokoyama. A study on complex flow shop scheduling involving assembly work. Japan Management Association En gineering Journal, Vol.49, No.1, 1998.
5. [5] Masao Yokoyama. Complex flow shop scheduling involving assembly work and setup work. Transactions of the Japan Society of Industrial Engineers, Vol.51, No.4, pp.293-305 (2000).