1. E. H. Choi, “Development trend of oscillator and
electromagnetic pulse bomb for high-power microwave,” KIPE
Magazine, vol. 9, no. 1, pp. 20-25, Feb. 2004.
2. High-Altitude Electromagnetic Pulse(HEMP) Protection for
Ground-Based C4I Facilities Performing Critical, Time-Urgent Missions, Part
I - Fixed Facilities, MIL-STD-188-125, Jul. 1998.
3. T. H. Jang, “Analysis of PCI cable effects in HEMP conducted
disturbance,” The Journal of Korean Institute of Electromagnetic
Engineering and Science, vol. 24, no. 8, pp. 772-780, Aug. 2013.
10.5515/KJKIEES.2013.24.8.772
4. Y. J. Kim, H. J. Kang, Y. K. Jeong, D. G. Youn, and Y. B. Park,
“Analysis and performance improvement of integrated E1 pulse generator
for EMP protection performance test,” The Journal of Korean
Institute of Electromagnetic Engineering and Science, vol. 29, no.
6, pp. 415-423, Jul. 2018. 10.5515/KJKIEES.2018.29.6.415
5. A. J. Nalborczyk, “HEMP filter design to meet MILSTD-188-125
PCI test requirements,” in 2008 10th International Conference on
Electromagnetic Interference & Compatibility, Bangalore,
2008, pp. 205-209.