PLANNING OF PHOTOVOLTAIC AND PLN HYBRID SYSTEM IN BANGKA BELITUNG UNIVERSITY
-
Published:2019-10-03
Issue:2
Volume:6
Page:56-60
-
ISSN:2622-4852
-
Container-title:Jurnal Ecotipe (Electronic, Control, Telecommunication, Information, and Power Engineering)
-
language:
-
Short-container-title:ECTP
Author:
Sunanda Wahri,Siregar Muhammad Ali Raja,Putra Ghiri Basuki
Abstract
Electricity at Universitas Bangka Belitung is currently supplied by the Bangka Belitung Region PLN with a power supply of 690 kVA to meet electrical energy needs. This study analyzes the hybrid photovoltaic-PLN pattern in UBB to find out more economical systems. The calculation result of the more economical hybrid pattern is the pattern with the distribution of PLN's load of 70% -30% PLTS which results in a Net Present Cost (NPC) value of US $ 1,071 M and a Cost Of Energy (COE) of US $ 0.107.
Publisher
Universitas Bangka Belitung
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献