1. 1. Andrzejewski, K.T., Cooper, M.P., Griffiths, C.A., Giannetti, C. (2018) Optimisation process for robotic assembly of electronic components. International Journal of Advanced Manufacturing Technology, vol. 99, no.12, pp. 2523-2535 Available at: https://doi.org/10.1007/s00170-018-2645-y
2. 2. De Matta, R. (2019) Minimizing the total waiting time of intermediate products in a manufacturing process. International transactions in operational research, vol. 26, no. 3, pp. 1096 - 1117 Available at: https://doi.org/10.1111/itor.12343
3. 3. Vasyltsiv T.H., Shuper I.Yu. (2008) Udoskonalennia systemy upravlinnia vyrobnychoiu prohramoiu pidpryiemstva iz urakhuvanniam vplyvu faktoriv zovnishnoho seredovyshcha [Improvement of the management system of the enterprise's production program taking into account the influence of factors of the environment] Naukovyi visnyk : Zb. nauk.-tekhn. prats Nats. lisotekhn. un-u Ukrainy. vol. 18.1., pp. 190 - 194.
4. 4. Hukaliuk A.F., Senyshyn O.S. (2006) Modeliuvannia protsesu rozrobky optymalnoi vyrobnychoi prohramy [Modeling the process of developing an optimal production program] Aktualni problemy ekonomiky. No. 9., pp. 204 - 211
5. 5. Maslenikov O.Yu, Savuliak S.I. (2010) Optymizatsiia vyrobnychoi prohramy pidpryiemstva [Optimization of enterprise production program] Naukovyi visnyk NLTU. vol. 20.2., pp. 264 - 266.