Author:
Ho William,Lee Carman K M,Ho George To Sum
Reference24 articles.
1. Akgunduz, A., Zetu, D., Banerjee, P. and Liang, D. (2002) Evaluation of sub-component alternatives in product design processes. Robotics and Computer Integrated Manufacturing 18: 69–81.
2. Ballou, R.H. (1999) Business Logistics Management: Planning, Organizing, and Controlling the Supply Chain. New Jersey: Prentice-Hall.
3. Braglia, M., Gabbrielli, R. and Miconi, D. (2001) Material handling device selection in cellular manufacturing. Journal of Multi-Criteria Decision Analysis 10: 303–315.
4. Çebi, F. and Bayraktar, D. (2003) An integrated approach for supplier selection. Logistics Information Management 16: 395–400.
5. Crary, M., Nozick, L.K. and Whitaker, L.R. (2002) Sizing the US destroyer fleet. European Journal of Operational Research 136: 680–695.
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献