1. Allen, J., Robinson, C. and Stewart, D. 2001, Lean Manufacturing: A Plant Floor Guide, Society of Manufacturing Engineers, Dearborn, Michigan, United States of America.
2. Gregory, I. C. and Rawlings, S. B. 1997, Profit from Time, Macmillan Press, Basingstoke, Hampshire.
3. Hopp, W. J., Spearman, M. L. and Woodruff, D. L. 1990 “Practical Strategies for Lead Time Reduction”, Manufacturing Review, Vol. 3 No. 2, pp. 78–84.
4. Imai, M. 1997, Gemba Kaizen: A Commonsense, Low-Cost Approach to Management, McGraw-Hill, New York, NY.
5. Johnson, D. J. 2003, “A Framework for Reducing Manufacturing Throughout Time”, Journal of Manufacturing Systems, Vol. 22 No. 4, pp. 283–298.