1. Abourraja, M.N., M. Oudani, M.Y. Samiri, and N. Rouky. 2017. A Multi-agent Based Simulation Model for Rail-Rail Transshipment: An Engineering Approach for Gantry Crane Scheduling. IEEE Access 5: 13142–13156.
2. American Society of Civil Engineers (ASCE). 2017. Infrastructure Report Card.
https://www.infrastructurereportcard.org/wp-content/uploads/2017/01/Inland-Waterways-Final.pdf
.
3. America’s Watershed Initiative (AWI). 2015. America’s Watershed Initiative Report Card for the Mississippi River.
http://americaswatershed.org/reportcard/the-basins/arkansas-red-rivers/
.
4. Arkansas Oklahoma Port Operators (AOPOA). 2012, March 23. McClellan–Kerr Arkansas River Navigation System Waterway Facts. History.
http://www.aopoa.net/history/facts.htm
.
5. Arkansas Waterways Commission (AWC). 2011, March 23. Waterways Commission. Arkansas Waterways Commission.
http://www.waterways.arkansas.gov
.