1. Anderson E, Daniel JS (2013) Long-term performance of pavement with high recycled asphalt content: case studies. Transportation Research Record: Journal of the Transportation Research Board, No. 2371. Transportation Research Board of the National Academies, Washington, DC, pp 1–12. doi: 10.3141/2371-01
2. Apeagyei A, Clark T, Rorrer T (2013) Stiffness of high-RAP asphalt mixtures: Virginia’s experience. J Mater Civ Eng 25(6):747–754. doi: 10.1061/(ASCE)MT.1943-5533.0000543
3. Bodin D, Terrier J-P, Perroteau C, Hornych P, Marsac P (2010) Effect of temperature on fatigue performances of asphalt mixes. In: 11th International conference on asphalt pavements, volume 1 of 3. ISAP, Nagoya. ISBN 978-1-61839-073-8
4. Colbert B, You Z (2012) The determination of mechanical performance of laboratory produced hot mix asphalt mixtures using controlled RAP and virgin aggregate size fractions. Constr Build Mater 26(1):655–662. doi: 10.1016/j.conbuildmat.2011.06.068
5. Copeland A (2011) Reclaimed asphalt pavement in asphalt mixtures: state of the practice. Federal Highway Administration, Report No. FHWA-HRT-11-021. Form DOT F 1700.7 (8-72)