Author:
Jabari Ahmed Nedal Abid Al Kareem,Hasan Afif
Abstract
Nowadays, the industrial sector takes up a significant portion of the world's total energy consumption. This sector is responsible for half of the total energy consumed in the world. Therefore, efficiency in the industrial sector becomes an essential issue. One of the main factors triggering the high energy consumption in this sector is that many machines are left idle. Idle machines during the manufacturing process require electricity and other energies. This research aimed to develop a firefly algorithm that can minimize the energy consumption in the hybrid flow shop scheduling problem. This algorithm is used to determine the optimum order of the jobs. The ultimate goal is to minimize energy consumption. The experiment on the algorithm was conducted by employing iteration and population variations. The research results show that population and iteration affect the quality of the hybrid flow shop scheduling solution.
Publisher
Universitas Muhammadiyah Malang
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献