1. Álvarez, E., Ferrer, J.C., Muñoz, J.C., and Henao, C.A., Efficient shift scheduling with multiple breaks for full-time employees: A retail industry case, Computers & Industrial Engineering, 2020, Vol. 150.
2. Asefeh, H.G. and Rabbani, M., A novel mathematical model for manpower scheduling in break (relief) times in mixed model assembly lines, Social and Behavioral Sciences, 2012, Vol. 62.
3. Brann, D.B., Thurman, D.A., and Mitchell, C.M., Human interaction with lights-out automation: A field study, Proceedings Third Annual Symposium on Human Interaction with Complex Systems, HICS’96, IEEE, pp. 276-283.
4. Cheon, S.K., Prabhu, R., Adres, N., Jang, B.C., Eom, Y.G., and Eom, Y.G., Simulation Modeling of Automotive Componet Manufacturing Plant Using ARENA, 2004.
5. Choi, K.S., Park, K.A., and Yun, Y.S., A Methodology for Productivity Improvement using Simulation Technique in Small and Medium Enterprise, Journal of Industrial Economics and Business, 2020, Vol. 24, No. 4, pp. 1969-1987.