Abstract
AbstractFor the construction of a hydro-electric power station in western Norway, a diversion tunnel was made to collect subglacial melt water under an outlet glacier from the Folgefonni ice cap. Many investigations were carried out by glaciologists and engineers before the project could begin, and several unexpected problems arose during the completion of the project. This paper deals with some of the problems and how they were solved.To avoid coarse glacier-carried material from being flushed into the water-collecting tunnel system, a large sedimentation chamber was constructed in the bedrock under the glacier. The dimensions of this huge chamber were decided from sediment-transport studies in the glacier stream and from studies of old bottom deposits in a lake close to the glacier front.Ice-velocity measurements were made on the glacier surface and similar studies were attempted in sub-glacial ice caves made by spraying hot water near the glacier bed, where the ice is 170 m thick.The subglacial water-drainage system was studied from a horizontal tunnel constructed in the bedrock under the glacier. Some preliminary conclusions are drawn from these studies.In future, it will still be possible to undertake subglacial studies because inspection tunnels have been left in the bedrock, and the accessibility is relatively good.
Publisher
International Glaciological Society
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献