Author:
Ryazanova Galina Nikolaevna,Churilina Yulia Yu.
Abstract
The efficient operation of main oil pipelines - one of the most important and urgent problems of Russia. Ducker - one of the most technologically advanced stages of construction of the road trunk pipeline. It is important to make the right choice of the method for installing the pipeline, since the speed of construction, economic costs of work, the reliability of the underwater crossing section, and, as a consequence, the uninterrupted operation of the entire main oil pipeline, environmental friendliness of both the installation and further operation will depend on this. underwater passage. Thus, the purpose of this work is to perform a comparative analysis of the methods for the construction of siphons, highlighting the advantages and disadvantages of each method. The results of the work can be applied in the construction of a new route, as well as in the overhaul of underwater crossings that have worked out their time.
Publisher
Samara State Technical University
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献