Author:
Tshidavhu Fhumulani,Khatleli Nthatisi
Publisher
Sun Media Bloemfontein Pty Ltd
Reference68 articles.
1. Adugna, N. 2015. A study of causes of delay and cost overrun in office construction projects in the eThekwini Municipal Area, South Africa. s.l.: Durban University of Technology.
2. Akanni, P.O., Oke, A.E. & Akpomiemie, O.A. 2014. Impact of environmental factors on building project performance in Delta State, Nigeria. HBRC Journal, 11(1), pp. 91-97. https://doi.org/10.1016/j.hbrcj.2014.02.010.
3. Akintoye, A. & Main, J. 2007. Collaborative relationships in construction: The UK contractor's perception. Engineering, Construction and Architectural Management, 14(6), pp. 597-617. http://dx.doi.org/10.1108/09699980710829049.
4. Alaghbari, W., Kadir, M.R.A., Salim, A. & Ernawati, B. 2007. The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), pp. 192-206. https://doi.org/10.1108/09699980710731308.
5. Aljohani, A., Ahiaga-Dagbui, D. & Moore, D. 2017. Construction projects cost overrun: What does the literature tell us? International Journal of Innovation, Management and Technology, 8(2), pp. 137-143. https://doi.org/10.18178/ijimt.2017.8.2.717.
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献