1. Alvard, A. A., & Tokarev, M. A. (2002). Methodology of restoration and increase of injectivity of injection wells. Interval, 12, 44- 47
2. Alvard, A. A., Tokarev, M. A., Smirnov, V. B., & Islamov, R. G. (2001). A systematic approach to the restoration and increase of potential injectivity and productivity of wells, with account of the structural and texture features of the development object reservoirs. Oil and Gas Problems: Materials of the III Congress of Oil and Gas Producers of Russia. Ufa, 191-192.
3. Ahmadov, T. R. (2019). Method of determining the location of the pinch point using seismic survey in some areas of the Absheron Peninsula, Revista de la Universidad del Zulia, 10 (26), 82-97.
4. Basniev, K. S., Kochina, I. N., & Maksimov, V. M. (1993). Underground hydromechanics. Nedra, Moscow.
5. Buckley, J. S., & Morrow, N. R. (2011). Improved oil recovery by low-salinity waterflooding. J. of Petroleum Technology, 2, 106–113.