Timelines of Transportation Infrastructure Delivery 2000 to 2018 in Toronto, Canada and London, UK

Author:

Saxe Shoshanna,Dean Marco,Raghav Shivani,Durrant Dan,Siemiatycki Matti

Abstract

This paper explores the timelines of large transportation infrastructure delivery, from first proposal to construction and opening in London, UK and Toronto, Canada. The goal of the paper is to identify both how long it takes projects to go from idea to delivery, the relative time of different stages in the delivery process, and if projects with long timelines see physical or technological changes in their design. This work contributes to two ongoing discussions around the speed of infrastructure delivery, one that argues infrastructure moves too slowly and major efforts are needed to speed delivery and another that argues that good infrastructure thinking requires time to breathe and care should be taken in rushing through the delivery process. Detailed delivery timelines from initial proposal to construction or operation are developed for 26 transportation projects (16 in Toronto and 10 in London) between the years 2000 and 2018. For each project the timelines of inception, approval, planning, procurement, environmental assessment, construction and operational phases are identified and compared. Long informal gestation periods are identified for many projects, particularly for linear projects. In many instances the informal gestation period dwarfs the time projects spent in formal planning. This research highlights the need to expand the conception of timeliness of infrastructure delivery to include the lengthy periods of informal debate and planning that can span years and build up community expectations about the imminence of a project, even before it has received formal assessment or approval. Detailed delivery timelines from initial proposal to construction or operation are developed for 26 transportation projects (16 in Toronto and 10 in London) between the years 2000 and 2018. For each project the timelines of inception, approval, planning, procurement, environmental assessment, construction and operational phases are identified and compared. Long informal gestational periods are identified for many projects, particularly for linear projects. In many instances the informal gestation period dwarfs the time projects spent in formal planning. This research highlights the need to expand the conception of timeliness of infrastructure delivery to include the lengthy periods of informal debate and planning that can span years and build up community expectations about the imminence of a project, even before it has received formal assessment or approval. 

Subject

Urban Studies,Transportation,Geography, Planning and Development

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3