Affiliation:
1. University of Iceland, Hjardarhagi 2-6, 107 Reykjavik, Iceland
2. Public Roads Administration, Borgartún 7, 105 Reykjavik, Iceland
Abstract
Since 1983, 12 Icelandic bridges have been base isolated for seismic protection. Lead-rubber bearings have been used in all the cases. The Thjorsa River Bridge, built in 1950 and retrofitted with base isolation in 1991, is instrumented by strong-motion accelerometers. The bridge has one 83-m-long main span and two 12-m-long approach spans. Only the main span, a steel arch truss with concrete deck, is base isolated. In June 2000, two major earthquakes of magnitude 6.6 and 6.5 occurred in South Iceland; the epicenter was close to the Thjorsa River Bridge. In the first earthquake, a peak ground acceleration of 0.53 g was recorded at the bridge site, and in the second earthquake, a peak ground acceleration of 0.84 g was recorded. The Thjorsa River Bridge survived the earthquakes without any serious damage and was open for traffic immediately after the earthquakes.
Subject
Geophysics,Geotechnical Engineering and Engineering Geology
Cited by
17 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献