1. The 6.5-m MMT Telescope: status and plans for the future
2. Developing an infrared APD array camera for near-infrared wavefront sensing;Butko,2018
3. Queue scheduling software at the MMTO;Gibson,2018
4. Re-aluminization of the 6.5m primary mirror at the MMT Observatory;Goble,2018
5. Developing new adaptive secondary electronics for the MAPS project;Hinz,2018