1. Aeroengine Product development System maturity Analysis;Su;Aerospace Power,2020
2. Office of the chief engineer, “NASA Program and Project Management Process and Requirements,” roc. SPIE 4445, 119–129 (2001).
3. Maturity identification and cultivation of Dongsi satellite public Platform;Li;Quality and Reliability,2012
4. Department of Defense, “Technology Readiness Asseseement Deskbook,” (2009).
5. Wangren and Liyan, “Advances in research on low pressure discharge,” Space Electronic Technology(1), 1–6 (2015).