1. Final design of the Large Synoptic Survey Telescope,;Kahn,2016
2. LSST Telescope and Site Update,;Gressler,2016
3. Barr, J., Sebag, J and Krabbendam, V., “LSST Summit Facility Design Requirements Document”, LSST LTS-53 (http://ls.st/LTS-53)”, (2005 orig., 2009 version-control).
4. Overview of LSST Mirror System;Araujo,2016
5. Sebag, J., Nordby, M., et.al. “Camera to Summit Facility Interface Control Document”, LSST LSE-65 (http://ls.st/LSE-65), (2005 orig., update 2014).