Author:
Kholil Muhammad,Firdaus Alfa,Haekal Jakfat
Reference7 articles.
1. Analisis Penerapan Lean Production Process untuk Mengurangi Lead Time Process Perawatan Engine (Studi Kasus PT.GMF AEROASIA)
2. Kholil, Muhammad, Jakfat Haekal, Adizty Suparno, D. Savira, and Tri Widodo. "Lean Six sigma Integration to Reduce Waste in Tablet coating Production with DMAIC and VSM Approach in Production Lines of Manufacturing Companies." International Journal of Scientific Advances ISSN: 2708-7972, no. 2 (2021): 5.
3. Kholil, Muhammad, Jakfat Haekal, Dian Eko Adi Prasetio, and Sulaiman Hasan. "The Lean Manufacturing Design for Improving Production Scheduling Using Product Wheel Method in Chemical Manufacturing Company, Indonesia." (2020).
4. Comparative Analysis of Raw Materials Control Using JIT and EOQ method For Cost Efficiency of Raw Material Supply in Automotive Components Company Bekasi, Indonesia
5. Bergiante, Nissia, Lucca Bevilacqua Gomes, and Bruno Soares de Melo Barreto. "Value stream mapping in a company of the pharmaceutical products distribution business: a case study." Journal of Lean Systems 5, no. 4 (2020): 89–118.